Detailing the myriad of potentially complex junctions between components was carried out partially through timber scale models. It was an intention of the design to make a feature of intermediate columnss and conections. The lightweight units were to connect to the ground via earth anchors to the legs, rather than traditional mass concrete foundations. Double skinned, fully insulated infill panels & suspended floors were to be pre-fabricated.